Procurement

KEY RECOMMENDATION: Use modular contracting to better connect the right vendor to the right task, break vendor lock-in, and reduce risks associated with any one vendor. Modular contracting works best with an agile development model, a modular technical design, and Open Source Quality Assurance (OSQA) practices.

EXAMPLE: California's modular contracting approach in overhauling some legacy systems in their Child Welfare system enabled them to work with multiple vendors to dramatically reduce their delivery timeline from years to months.

KEY RECOMMENDATION: Take explicit steps to attract bids from vendors who are experienced at open-source development rather than vendors who are only experienced at government contracting. Conduct FOSS-specific outreach early in the RFP lifecycle and ensure solicitations are promoted in media specifically aimed at open-source developers, not just at government software vendors.

KEY RECOMMENDATION: Ensure you have the ability to deploy, (re)distribute, and modify the software under a suitable open-source, DPG standard license. Contracts should prevent any vendor from encumbering further development and distribution on either trademark or patent grounds and expressly forbid satisfying any deliverable with software that includes any 'forever proprietary' component. Lastly, you should require acceptance of code into the open-source repository as part of the definition of contractual delivery in software milestones.

KEY RECOMMENDATION: Integrate OSQA practices into procurement, vendor management, and your own planning to ensure you gain the full benefits of open source.

This module describes a few procurement tips, such as modular contracting and open source quality assurance practices, like OSQA practices, that can help you better attract and manage vendors to create a successful open-source DPG.

This module complements the Digital Impact Alliance's (DIAL) Procurement of Digital Technology guide. That high level, comprehensive guide is aimed at helping government agencies manage general digital spend, from strategic planning through lifecycle management. This module dives more deeply into specifics around procurement related to open-source software, particularly working with vendors.

Free and Open Source Software (FOSS) has rapidly become successful in the commercial sector. Few modern enterprises can thrive without taking full advantage of open-source antecedents to power a competitive business. More and more sectors find themselves taken over by open-source offerings that crowd out once-dominant proprietary competitors. It is fair to say that open source, once maligned by much of the commercial software world, has emerged victorious and is now a major component of every software effort of note today.

Relatedly, an agile, iterative, and continuous style of development has taken hold at the most successful technology companies. Gmail, Facebook, and other online services are constantly being rewritten and redeployed, on a component by component basis, at a frequency measured in days and sometimes even in hours. Companies have learned how to structure their software development efforts so that user-facing systems can be rebuilt continuously, partially, reliably, and efficiently. A change in one place doesn't make everything else break, because a modular architectur with clear module boundaries has been defined. These boundaries often reflect organizational divisions as much as technical ones.

FURTHER READING: For a good introduction to modular architecture, see this blog post, which is the first in a two-part series. Another useful resource is this blog post, which focuses on web development. See also the section on Extensibility in the Adoptability module.

This style of development is closely connected to open source: the availability of swappable open-source components makes modular development not only possible but practically inevitable, and it rewards companies for participating in the open-source projects they depend on the most. Sierra Leone built an open, composable infrastructure platform that any government ministry needing a data warehouse/analytics/visualization solution can plug into. Initial funding was to build this for a Geographical Informations Systems (GIS) application, but their modular approach means the investment is useful in other domains, thus amplifying the effect of the work and helping other ministries move more quickly on their own data-intensive projects.

Time will tell, but the open-source, open-standards based modular approach might also make DPGs particularly attractive to funders, as one investment can reap a significantly compounded return as that module gets adapted and re-used. Open APIs and a modular architecture can also help bring in funding for specific use cases, as was the case for the DPG DHIS2 and philanthropic funding for integrating DHIS2 with Microsoft BI -- an activity led not by core DHIS2 members but by a non-profit organization and their commercial partner.

FURTHER READING: The US Government Accountability Office published a guide to agile, modular development in 2012 that is a useful resource for government agencies.

Generally speaking, though, government has lagged behind. While governments have begun to embrace open-source approaches and agile develoment, actual open-source successes are much more rare in government than in the private sector. There are a lot of reasons why this is the case, but none of them is that open source is somehow unsuited for government use. Rather, government has not yet spent a decade honing open-source practices that take into account the particular needs of government software development.

One place this disparity appears is in contracting and procurement. While government has much to gain from open source and is in the process of developing and spreading best practices on how to do that, it cannot simply borrow procurement models wholesale from the private sector. Government has an obligation to safeguard the public trust. Its operations are accountable to public political process. Public investments are judged by different metrics than those used in private-sector commerce.

That is not to say that government lacks the knowledge or ability to succeed at FOSS projects. It does suggest, though, that approaches should be designed with care for the particular constraints and opportunities found in public agencies. Some government agencies have forged advances from which others can learn.

Modular Contracting

One center of excellence in government development of FOSS software is 18F, the digital service delivery arm of the United States General Services Administration. They focus on technology procurement for federal agencies, and their methodology typically begins with agile and open-source approaches. 18F is generally considered a model agency when it comes to open source. They advise federal projects to consider procurement based on a model of "modular contracting" in which large projects are procured via a set of small contracts, each to the vendor most suited for a particular task. This is a good starting point for state and local technology procurement as well (18F also addresses non-federal modular contracting).

This modular approach to contracts has several benefits, beginning most importantly with breaking vendor lock-in. At any point, a well-procured effort should provide recourse to multiple, credible vendors, each of whom has familiarity with the software, experience working with the other teams, and is able to work well with the agency's open-source approach. Every vendor becomes replaceable because none by itself is so crucial to the process that it cannot be replaced.

With that goal in mind, 18F and others in the industry recommend structuring procurement as multiple contracts distributed among a group of vendors. They also recommend relatively small contracts, though "small" often refers to a different scale, depending on the locale and the level of government.

It is difficult to make one-size-fits-all recommendations as to the correct size of a modular contract. That will depend on the overall budget, the project, and the ecosystem needs at a particular stage of development. For a medium-sized informational website project, one might employ contracts no smaller than $60,000. This size allows multiple vendors while still providing enough budget room for vendors to deliver without squeezing margins so much that quality suffers. Generally, on the upper end, we do not recommend a monetary limit--- some modules will, after all, make the most sense as larger components. The key is to choose module sizes that align with both the component and the overall multiple-vendor ecosystem your agency is building.

One reason to structure procurement this way is to reduce risk associated with any one vendor. There is a lot one might say about the nature of risk in government technology procurement. For the purposes of this report, though, spreading risk among a series of vendors reduces the chances of catastrophic failure and increases the ability to recover from problems, while still allowing an agency to concentrate overall responsibility for delivery in the hands of one integration vendor. This reduction in risk is usually worth the attendant increases in cost and contracting overhead that are inevitable when one is working with more vendors.

One of the ways this strategy improves the risk outlook is by opening options for contracting with vendors with specific expertise. No one development firm is good at every possible technology stack. Native Android and iOS expertise differ from each other and from web development. Many development vendors are good at one of these; few can deliver all three at the highest levels. Similarly, front end differs from back end development, and they both depart from user experience design. Small contracts --- typically under $100,000, in most contexts --- provide the opportunity to choose the best vendor for a given task, not one vendor who averages out to be the best across the board. This allows the hiring of subject-matter experts and can provide access to the best experience industry can offer. In any event, it might also be useful to keep in mind any thresholds on contract size that enable streamlined procurement process for smaller contracts. Using those as a guide to keep contracts small has the added benefit of speeding up and simplifying procurement.

Issuing small contracts might also help agencies meet mandated targets for contracting with small businesses. Our experience after interviewing many government procurement officials is that a major barrier to small business contracting is a perception of risk in asking a small or new business to tackle a large, important project --- established vendors often end up with the big contracts partly because they are established. Smaller contracts are inherently less risky, and multiple vendors working in an open mode makes it likely that issues will be surfaced before they become catastrophic, when remediation might still be easy and relatively inexpensive.

Small, modular contracts align well with a technologically modular design. Modular contracting enforces modular technical design as different teams need to separate concerns so they can all develop in parallel. Similarly, a technically modular product can be developed by a variety of smaller vendors in ways that a monolithic structure would prevent. While one could hire one vendor to build an entire system, teams that work together under one roof are more likely to --- indeed, almost inevitably will --- violate modular boundaries under deadline pressure. Separating those teams helps enforce the technical boundaries that keep an open-source process functioning. Another approach to enforcing modular separation is through OSQA, described below.

Should there be a significant set of particular local needs for your DPG, a modular architecture and modular contracting provides flexibility to accomodate customizations and better support local business and talent development. As an example, UNICEF contracted with a commercial software develoment vendor to create the open-source DPG Primero platform. Deploying agencies can find their own vendors to design and build Primero forms and workflows, but if the project is complicated or the deploying agency is unable to source additional development and funds locally, UNICEF entered long-term agreements with four IT service providers to help.

Finally, we note that modular contracting aligns perfectly with the Open Contracting Data Standard DPG.

KEY RECOMMENDATION: Modular contracting can help to better connect the right vendor to the right task, break vendor lock-in, and reduce risks associated with any one vendor. Modular contracting works best with an agile development model and a modular technical design.

One aspect of modular contracting that is sometimes overlooked is that it can be costly to conduct many smaller rounds of procurement. Even if those smaller rounds qualify for faster processes with less overhead, the logistics around each agreement are themselves a factor that introduce both delay and risk to a project. It is quite common for all parties to agree on a set of work to be done and yet never proceed all the way through the contracting stage for various reasons.

Vendors too see a rise in costs. Because municipal scopes and budgets are often smaller than for federal projects, vendors at this level of government often find the small sizes of modular contracts a challenge. Smaller contracts for shorter periods of work provide less stability. Vendors find themselves unable to make the long-term commitments needed to hire long-term employees instead of ad-hoc contractors tend not to stay as long. That raises their costs, which of course eventually raises costs for your agency. Modular contracts can cause additional staffing complexity for vendors as well (see below, Vendor Staffing).

For these reasons, we suggest that agencies engaged in modular contracting place those contract modules in larger Master Services Agreements ("MSAs") while also encouraging vendors to seek multiple contract modules under their MSA. In addition, one can increase the size of modules as a project proceeds. Once a project has a set of vendors who understand the product, demonstrate open-source expertise, and have established a track record of delivering quality work on time, the benefits of modular contracting can decrease while the costs remain elevated. At that point, one might opt for larger contract modules, especially as the project grows in scope. One might also allocate these larger modules among its existing set of vendors as a way to balance risk management with cost management.

RECOMMENDATION: Agencies using modular contracting should consider placing these smaller contracts within larger Master Service Agreements for more efficiency and flexibility.

FURTHER READING: The Obama administration in the United States produced a useful and very comprehensive guide to modular contracting.

Open Source Solicitation

Modular contracting can often be done in small enough contracts that streamlined procurement processes are available. At some point, though, an agency may want to embark on a larger project that does not easily fit into a "small contracting" budgeting provision. In that case, it will need to operate a formal RFP process. This section contains information on open-source concerns that should be considered during that process but many points are also relevant in non-RFP requiring situations.

First, it's essential to include the requirement for open-source development and final product in the RFP stage.

A common pitfall in procurement is beginning an RFI and RFP process with high hopes for attracting vendors eager to provide agile, open-source development in a public spirit of building multi-jurisdictional software but ending up unable to deliver on those hopes. Unfortunately, RFP responses often include a long list of traditional vendors who are not eager to work in this manner and perhaps lack the experience needed to do so well. The hoped-for vendors are nowhere to be found. Eventually, as RFP deadlines loom, agencies look around for additional submissions and maybe even try to promote the RFP in new forums. When FOSS-experienced vendors notice the RFP, they have a short week to submit a hastily compiled bid that shows both their inexperience and the rushed timeframe.

This failure pattern appears at all levels of government and in many different types of agencies. The truth is that even as governments are still gaining sophistication with open source, the commercial FOSS world is also still gaining maturity in navigating government procurement systems. Many open-source development companies, especially smaller and less traditional ones, do not have procedures that let them discover open-source opportunities at early stages. If government is to succeed at open source, it needs to expand the pool of RFP respondents. This might mean dropping the requirement for a vendor to have experience and references around past government projects.

KEY RECOMMENDATION: Take explicit steps to attract bids from vendors who are experienced at open-source development rather than vendors who are only experienced at government contracting.

There are several strategies procurement agencies use in this regard:

First, it pays to ensure that solicitations are promoted in media aimed at open-source developers, not just at government software vendors. An agency might maintain a list of community connectors who can promote a solicitation to a wider open-source audience (academic relationships can help here). It is important to conduct this outreach early in the process because newer vendors will need more time than government-experienced vendors to prepare responses. (Although it goes without saying, it is worth emphasizing here that this type of targeted outreach must comply with ethics and procurement rules.)

KEY RECOMMENDATION: Conduct FOSS-specific outreach early in the RFP lifecycle and ensure solicitations are promoted in media specifically aimed at open-source developers, not just at government software vendors (in alignment with your agency's ethics and procurement rules).

Second, it is important to be clear in describing project requirements and emphasizing the need for open-source deliverables, process, and experience (see Open Source Quality Assurance below for more on this; text in the Appendix: Sample Contract Language can be copied as merited for the RFP as well). The phrase "open source" applies in contexts other than software (e.g., open source intelligence), so be sure to spell out the full phrase "open source software" or "open-source software" for vendors searching the web or databases for opportunities. The types of vendors an agency hopes to attract will be sophisticated about the differences between open-source software, open data, and agile development. Be specific and strategic in using these terms and back them up with questions designed to elicit experience in these domains.

Third, if using modular contracting, make sure vendors understand the breadth of solicitations so they can understand both their specific bid and the overall process.

Fourth, open-source vendors expect agile, iterative development. However, a traditional RFP process often asks vendors to envision the entire engagement and price it as a whole, which requires a degree of pre-planning that open-source modular contracting is specifically designed to avoid. Craft a process that is clear about goals and requirements but leaves room for vendors to meet them in flexible ways that might change over the course of the project. This requires being clear about which requirements are truly fixed and which ones were added because they seem likely to be needed on the path toward a complete solution.

RECOMMENDATION: Although contract amendments are possible (especially if they are just budget reallocation), you should seek contract terms that allow flexibility and iteration wholly within the terms of the agreement. Include a process (and budget) for iterations and lightweight changes that do not require giving up other features and milestones.

The upside for an agency is that this flexibility runs in both directions. Procuring agencies should be able to request incremental improvements that were not specified in detail at project inception without incurring the costs of change orders. Similarly, agencies should avoid vendors that demand high-overhead change orders for minor adjustments. Neither vendors nor agencies can be expected to predict every last detail of development in advance. A process that requires such prediction is a broken process.

In talking to open-source software development vendors, it is clear that there are many capable firms that would provide excellent service to government agencies. Too many of these firms avoid responding to RFPs because they cannot navigate the process. Agencies can procure from experienced open-source vendors by attracting more of these vendors into the government services space and fostering competition in FOSS service delivery.

Intellectual Property Contract Terms

Beyond modular contracting, there are a series of best practices that can help maximize the benefits of a supportive vendor ecosystem. Adopting those best practices often starts with a consideration of contract terms.

Many government software vendors have traditionally retained intellectual property rights to the software they create even though that software was created at public expense. There are a variety of reasons why such arrangements were common in the past, but many of the conditions that made it necessary no longer hold. For example, government software is no longer likely to be delivered as a monolithic stack in which the government-procured layer is but one small party tightly coupled to a variety of proprietary parts owned by third parties. Modularity, FOSS libraries, and standardized, open technology stacks make that architecture a thing of the past.

Perhaps more importantly, government procurement agents today have more options in the marketplace. There is a growing number of experienced vendors capable of delivering world-class software who don't require exclusive legal rights to exploit the codebase at the end of the contract. Open source is competitive and is driving wholly proprietary approaches out of the market.

There are three classes of software delivered in a typical procurement scenario: third-party open-source software, pre-existing vendor-created software, and code custom-written by the vendor for the current project. Notice this list does not include any third-party proprietary software.

KEY RECOMMENDATION: Contracts should expressly forbid satisfying any deliverable with software that includes any proprietary component.

These different types of software are to some degree distinguishable for procurement purposes, but might be intermingled in the source code. We distinguish them at contracting just to ensure government agencies have the rights they need to proceed with their open-source plans and never need to secure a vendor's permission to operate, improve, or hire other parties to work on the software. This is the key point.

KEY RECOMMENDATION: No matter what happens with intellectual property rights at the contracting stage, you must have the ability to deploy, (re)distribute, and modify the software under a suitable open-source license (see the DPG standard requirements around licensing).

For third-party open-source software, this means that an agency must receive that software, clearly labeled, in a manner compliant with their original open-source license and under terms that are compatible with the intended license of the final product. For code written by the vendor for other engagements and not paid for by the contracting agency, this means delivered to the agency under an open-source license that allows redistribution under the intended license of the final product. There is no need for an agency to gain exclusive rights to these classes of software, and indeed, more distribtution is often better.

For code written by a vendor and paid for by an agency, the question of who should end up owning the rights is up for debate. Some agencies might be willing to see those rights remain in the vendor's hands as long as they receive an open-source license that allows further distribution under the intended open-source terms of the final product. So long as an agency secures those rights, it does not much matter who holds the copyright. Common practice, though, appears to be that the contracting agency ultimately gains all rights. In some cases, the vendor might receive a license back allowing proprietary relicensing so they can resell that software to other clients or in other markets. A vendor might even enjoy a period of exclusivity in its ability to make proprietary use of the software. Specific arrangements will vary, but there is no harm in them so long as a) the terms serve a larger goal of fostering a multi-vendor ecosystem, and, as noted above, b) the agency always has full rights, including redistribution rights, under the desired outbound open-source license.

As an example, the County of Los Angeles in California engaged a vendor, Smartmatic, to build a new open-source voting machines that debuted during the primary elections in March of 2020. LA owns the resulting software and hardware designs, and Smartmatic enjoys a period of exclusive ability to use proprietary licensing to exploit the designs in the market. At the same time, LA is moving toward granting the public open-source access to these materials. Smartmatic will have the proprietary rights it wants -- for a limited time -- as it tries to sell the system in other jurisdictions. While it will eventually have to compete with the open-source crowd, it is welcome to build a proprietary business if it can do so under such conditions. Officials in LA hope this will help create the demand that entices more participants to join the effort. Other public-spirited projects in which a primary vendor predominates have either considered or adopted similar arrangements.

It is worth making one final point about rights. As we touched upon earlier in the Introduction and Policy modules, open-source licenses commonly deal with copyrights. They do not adequately address trademarks and are uneven in their handling of patents. Contracts must secure terms that prevent a vendor from encumbering further development and distribution on either trademark or patent grounds. It's not enough to get a blessing for governmental or "public" use. What's needed is a promise to not make patent infringement claims on anyone for their use of the patent as embodied in the DPG.

KEY RECOMMENDATION: Contracts terms must prevent a vendor from encumbering further development and distribution on either trademark or patent grounds.

Open Source Quality Assurance

In addition to intellectual property clauses, we recommend using procurement structures to emphasize the requirement of an open-source development process. A vendor who merely delivers a timely set of open-source components has not actually done enough to succeed at contributing to a successful open-source project. In addition to writing quality open-source code, the vendor must enable all the other teams to succeed by participating in and reinforcing the open-source process.

Some vendors will be unable to manage this participation. They won't have the open-source experience or, in some cases, the temperament. No matter how much an agency might prefer experienced open-source vendors during the procurement process, it is likely that at least some vendors will end up on the team because they submitted bids that scored high on non-open-source criteria. To succeed, an agency cannot assume all its vendors will have the open-source skills they need. The agency can instead provide structures that ensure success even when relying on vendors who might otherwise fall short in their open-source practice.

Similarly, some vendors will be unwilling to participate in good faith. That is, they will be willing to check boxes on the paperwork, but behaviorally will default to the type of closed development process typically found in government contracts. Sometimes this unwillingness comes from a lack of experience and open-source skill. In some other cases, perhaps, a vendor may hope the open-source process fails, which could result in a final product that, while technically open-source, cannot actually be released as open-source, or that resists open-source dynamics, thus leaving the vendor as the sole practical source for that component in the government procurement marketplace.

Whatever the reason for failure to participate in an open-source process, agencies must have ways to bring recalcitrant vendors into process compliance. Otherwise, the project risks failure across multiple teams. To prepare for such situations, we recommend instituting Open Source Quality Assurance ("OSQA") at the project management level. See the Appendix: Sample Contract Language for a sample OSQA statement of work that can help you bring this practice into your project.

OSQA is a set of practices designed to ensure that an open-source project behaves like an open-source project. If vendors are delivering open-source code but not engaging in the process, the software will hit some of its milestones but fail as collaboration falters over time. Adding new vendors will be difficult. Teams will discover API mismatches when they try to integrate modular pieces. Patches will go unreviewed, or worse, be accepted anyway. Documentation will degrade to the point that modules can only be deployed by the teams that developed them, which reintroduces vendor dependency and lock-in. By the time these failures are obvious to the procuring agency, the final product will struggle as it experiences all the complexity of modular contracting without the benefits.

KEY RECOMMENDATION: Integrate OSQA practices into procurement, vendor management, and your own planning to ensure vendors follow through on the open-source development process as well as the product -- and that you gain the full benefits of open source. Bringing up OSQA requirements early in vendor engagement signals your seriousness about open-source success and puts vendors on notice, which is particularly helpful when relying on vendors that don't have much open-source experience. For a fuller description of what OSQA entails, please see a sample statement of work that includes OSQA in the Appendix: Sample Contract Language.

There are a variety of OSQA techniques one can introduce. OSQA can act as a gateway that enforces standards at the pull request stage. This means OSQA approval is needed before source code changes can be incorporated into the project. Because incorporating changes to source code is a required deliverable for all software development vendors, this method prevents vendors from fulfilling contractual milestones unless they meet quality standards. Vendors soon realize they cannot invoice if they do not deliver approved code, which provides OSQA an entry point into a collaborative discussion about best practices that deliver high-quality code that passes approval standards quickly.

OSQA enforces policies about testing, adherence to design guidelines, accessibility compliance, and communications (e.g. as using the public bug tracker rather than private emails), and it reviews documentation. OSQA periodically attempts to build and deploy the product by assigning a test deployment to an operations staffer who has no prior knowledge of the software. If that person, armed with nothing more than the documentation, cannot deploy, that surfaces issues that must be addressed.

Ideally, an agency should take part in the OSQA process itself by participating directly in development to at least some degree. This does not mean that the agency needs to be the primary driver of development for any particular component, or even a major contributor, nor does it mean that the agency should necessarily be the main supervisory provider of OSQA. It is just that even a small level of direct participation in collaborative technical work will provide a level of credibility and connection with all the vendors working in the project that cannot be achieved any other way. That credibility will pay dividends in every meeting, progress checkin, and contract negotiation by alerting external contributors (and especially vendors) that the procuring agency understands every aspect of the work. It will also help ensure that open-source processes are followed in spirit as well as in letter, since lapses will be more readily apparent, and it will help the agency to learn.

RECOMMENDATION: You should participate directly in technical development, even if only to a small degree, in order to create credibility and connection with vendors and contractors and to contribute to maintaining a consistent open-source culture. There are high, reusable dividends to this investment.

Furthermore, by requiring OSQA to sign off on code submissions, an agency can enforce standards in the one way that vendors cannot ignore: it stands between vendors and reaching their contracted deliverables. That is, it allows an agency to enforce open-source process compliance as a condition of being paid on time.

RECOMMENDATION: You should require acceptance of code into the open-source repository as part of the definition of contractual delivery in software milestones.

At every stage, the software should be ready for open-source engagement. OSQA is an agency's assurance that this is true.

Sitting on the tree is only one aspect of an OSQA program. There are a number of other strategies, and choosing the right mix for a given project should occur at an early stage of project specification. Fully describing all these techniques is beyond the scope of this module, but the point here is not that an agency should master all these techniques, just that it should identify and implement at least some approaches.

RECOMMENDATION: An agency should add OSQA elements to its requirements list when considering project roles. If it does not plan to manage OSQA in-house, it should consider contracting for it.

OSQA has a track record of success in government agencies. We have performed OSQA and seen it work well at several levels of government, from federal to local. In one instance, OSQA was begun long after the primary development vendor had begun work, and it was too late to establish open-source practices from day one. Instead, the OSQA team worked with the vendor and the procuring agency to identify process failures and teach open-source best practices. Over time, vendor participants as well as agency staff began to reap the benefits of investing in the process. After some time, teams embraced the process because it paid visible dividends (eventually including independent deployment by another jurisdiction). The OSQA team was able to back away, leaving the project to manage the process on its own. In later reviews of the work, we understand that they still rely on these processes as the project continues to develop.

For most projects, we recommend adding OSQA capability earlier in the process and combining that role with other project management duties. In some instances, this could fit well with a community manager role. This is what the Bill and Melinda Gates Foundation funded for the DPG Mojaloop to ensure that code contribution runs smoothly and prioritizes development of open-loop, pro-poor digital financial systems. Putting an OSQA role at the coordination center of a project helps to enforce standards, shape the process, and lead by example. It also puts it in a good position to play a role as advocate for an agency in evaluating contractor decisions and proposals. Ultimately, learning by example is how well-functioning open-source projects set norms, and as project development finds its rhythm, one can also expect less-experienced open-source vendors to learn from the others.

Data Protection and Security

Please see the Policy module for key points around security and data protection in vendor contracts, as well as the Appendix: Sample Contract Language for some relevant, example contractural language.

Vendor Staffing

Staffing a software development effort while engaged in modular contracting can be a challenge. Smaller contracts will tend to lead to smaller vendors as large vendors chase larger opportunities. Different contract modules will have different timeframes, and some vendors might even have discontinuous engagements that end well before the next one begins. This can be difficult for small vendors to manage --- they cannot afford to carry idle teammates and will either reassign them to other projects or, in the case of contractors, let them move on to other companies. When it comes time for those vendors to reapply themselves to the agency's work, they have to source new developers, onboard them, and hope they quickly come up to speed. That process cannot even begin until a contract is signed, and that usually means projects are understaffed at the start.

Surely, some might say, these staffing concerns are not the procuring agency's problem. After all, managing this type of staffing variance is exactly why an agency hires vendors in the first place. This is true, but that doesn't mean an agency avoids the costs and risks that come from a vendor's staffing issues. Schedules will still slip, tasks will be rushed to compensate, and costs will increase. Eventually, the agency will pay a price.

There are several approaches to problems of this nature. One avenue would be to design the development schedule to minimize discontinuities in work and contracts. Successful modular contracting requires admitting that an agency can, on paper, shift some costs and risks down to vendors, but that a successful project will avoid doing this. For vendors that an agency hopes will stick around, one approach is to structure MSAs that make adding development stages faster and easier. Provide for a certain amount of work between stages so that there are no completely dead periods. The project can use those work periods to tackle the technical cleanup and organization tasks (like good documentation) that fast-moving development projects never seem to have time to finish. Keep the team engaged with important, default work that is not tied to specific, big-ticket milestones. That way the team will remain employed and available to the procuring agency throughout the project.

At some agencies, procurement processes are prone to long delays in finalizing agreements. Approvals get held up. Contracts must be reviewed one last time. Changes in administration can put everything on pause. It is important for agencies to exercise self-awareness about such constraints and to guard against them.

As noted earlier, modular contracting can help by enabling an agency to specify work in sets that fit under caps that allow contracting with streamlined processes. Other tactics can help too: Begin procurement processes early, especially renewals for additional development stages. Adopt the MSA structure mentioned above, which has the added benefit of enabling vendors to operate under multiple contract modules at once, each with different end dates. Design contracts to run through periods when agencies might be distracted. It would be unreasonable, for example, to expect the officials at the Board of Elections to approve anything the week before an election.

Finally, there is another approach worth mentioning but not recommending. If an agency did not have any goals with regard to growing the pool of open-source contractors to include more small businesses, it might, as some large companies do, impose a rule that the vendor cannot depend on the agency for more than a certain percentage of its revenue. This might result in a preference for contractors large enough to absorb the cost of carrying under-utilized developers, or vendors large enough to have other projects with short term needs for those developers to fill. This might work, though we have only seen it used in the private sector, not the public sector. In any event, cultivating open-source contractors usually demands learning to work with smaller firms, so we hesitate to recommend this approach in most instances.

Of course, staffing will ebb and flow as work requires and budgets permit. Nothing in this section should suggest that an agency should constantly carry a full complement of developers with no regard to such considerations. The approaches described above are designed to provide tools and insights agencies can use when structuring successive contract modules. The disruption from small gaps can be larger than intended, but longer-term, planned staffing adjustments are always an available tool, even when issuing modular contracts.

RECOMMENDATION: Smaller modular contracts can make business more difficult for smaller vendors, especially in managing staffing and costs. However, you can alleviate this by: designing a development schedule to minimize discontinuities in work and contracts; adopt the MSA structure, which enables vendors to operate under multiple contract modules at once, each with different end dates; specify work in sets that fit under caps that allow contracting with streamlined processes; and begin the procurement process early, especially renewals for additional development stages.

Maintenance and Operations

One aspect of budgeting that is often overlooked is ongoing maintenance and operations (M&O). A well-designed software package should yield M&O costs that are predictable and that in most cases are fairly low relative to the cost of development (of course, there are exceptions). While there are many choices to be made about infrastructure, resource usage, deployment environments and so on, most of those choices result in fairly similar ongoing cost structures.

Usually, the constraints associated with M&O are related to integrating a deployment process with existing infrastructure. This is an efficiency measure but also a cost factor. That is, if an organization or a government has standardized infrastructure and process for managing ongoing deployments, the most cost effective approach is to put new technology within that structure. Backups, upgrades, security alerts, uptime management, and everything else are handled as a matter of course along with the rest of the technology. Doing any of these in an ad-hoc manner will usually raise M&O costs.

Sometimes government agencies have recourse to centralized IT departments that operate deployments across many agencies and departments. Central management, though, comes with its own constraints. Our experience suggests that often the only way to effectively manage an entire jurisdictions's worth of technology in one central place is to force all that technology to use the same technology stacks and to deploy in uniform configurations. This allows centralized IT to fit deployments into standard processes, automated tools, and low-knowledge management structures. This is an effective way to lower M&O costs, and a number of jurisdictions have adopted this approach.

Of course, there is a cost to restricting agencies to a set of uniform technologies arranged in pre-approved configurations. Central agencies who have to consider the implications of technology changes jurisdiction-wide sometimes find it difficult to explore new avenues as technology evolves. It is difficult to approve solutions that are well-suited to the needs of just one deployment scenario but require deviation from the uniform deployment standards. Every such deployment undercuts part of the rationale for centralization.

Regardless of where the deployment eventually resides, though, it is reasonable to build a monthly carrying cost into the budget. Even if centralized IT hosts the deploy, it is possible (perhaps even likely) that an agency will have to be a motivating force behind non-feature upgrades for stability and security. The centralized agency might also charge back some of its costs.

Custom software should not be treated like a depreciable asset that gets fixed when broken and replaced when outdated. Modular design and contracting approaches enable an agency to make continuous, small-scale investments in the software that can extend its lifespan indefinitely. Even major upgrades and transformations can be performed in stages. The same software development process that performs ongoing updates should also tend to maintenance of those modules. For software modules that are not currently undergoing active development, combine the maintenance with slowly tending to structure and paying down the "technical debt" that accumulates in projects and degrades them over time.

RECOMMENDATION: While operational costs might be a separate line-item, much of the maintenance work should be part of the ongoing, modular improvement that keeps software current and prevents an agency from having to start over. Be sure to build monthly carrying costs into your budget.